Basics (Wiring)

installation1

Insert 3 fingers under the metal bar. Push the wire through the hole (when the wire tip peeks out, push the wire perpendicularly into the metal bar). Tie a knot.

installation2

Tighten the knot. Loop the wire 5 times around itself tightly.

installation3

Cut the excess wire with a sharp pair of pliers. The wire is now secure.

Basics (Drilling)

installation6

Eye expansion bolt
Drill hole diameter: 10mm, Hole depth: 2½″
Phillips expansion bolt
Drill hole diameter: 10mm, Hole depth: 2½″
Plastic wall anchor
Drill hole diameter: 14″, Hole depth: 2″ (leave ½″ of screw out of the wall to catch the wire)

Wall Mount (Vertical)

installation4

Secure the wire on the top metal bar. The slag should be halfway between the metal bar and the top frame. (We strongly recommend adding a vertical wall mount for the Corner Trap X that is stacked on top)

Wall Mount (Horizontal)

installation5

Secure the wire across the metal bars. The slag should be halfway between the metal bars and the top frame.

Ceiling Mount

installation7

Left: Setup for a suspended ceiling mount. (vary the length of the wires to adjust the height of the suspension) Right: Setup for a flushed ceiling mount.

Flushed Ceiling Kit

Step 1
Drill a hole into the ceiling (Drill hole diameter: 10mm, Hole depth: 2½″)
Step 2
Hammer the Phillips expansion bolt into the ceiling hole
Step 3
Tighten the Phillips expansion bolt with a Phillips screwdriver
Step 4
Unscrew and remove the Phillips bolt only
Step 5
The Flushed Ceiling Kit comprises of 2 metal segments
Step 6
Place one segment of the Flushed Ceiling Kit against the ceiling hole
Step 7
Line the small hole of the segment against the ceiling hole
Step 8
Insert the Phillips bolt through the holes of the Flushed Ceiling Kit and into the ceiling hole
Step 9
Tighten the Phillips bolt with a Phillips screwdriver
Step 10
One segment of the Flushed Ceiling Kit is now installed
Step 11
Repeat the above steps for the other segment of the Flushed Ceiling Kit
Step 12
Ready the panel or trap to be installed by pushing it flushed against the ceiling
Step 13
Slide the panel or trap from a distance into the Flushed Ceiling Kit with great momentum
Step 14
Flushed ceiling installation complete